A Complete Kitchen Renovation, Properly Managed
A kitchen renovation can feel like a daunting undertaking. Coordinating different trades, managing deliveries, and keeping your home liveable throughout the process. It's a lot to manage. That's exactly why homeowners across Sheffield choose Sheffield Kitchen Fitters: Danny Pagden is your single point of contact, and your project runs smoothly from the first day to the last.
Danny manages the entire renovation process from strip-out to handover. This means you don't need to find separate plasterers, tilers, and floor fitters. Danny coordinates everything and makes sure each stage is completed to a high standard before the next begins.
What a Full Kitchen Renovation Includes
- Full kitchen strip-out and disposal of old units
- Plastering and wall preparation
- Electrical work (lighting, socket re-positioning, extraction)
- Plumbing, including re-routing where needed
- Flooring installation (tile, LVT, laminate)
- Wall and floor tiling
- Architraves, skirting and finishing joinery
- Full kitchen fitting
- Appliance installation
- Acoustic wall panels and specialist finishes
Managing Complexity With Care
A renovation in a small or awkward space requires as much creative problem-solving as it does technical skill. Whether that's working around existing pipework, maximising storage in a galley layout, or managing the needs of a household with young children. We've handled it all, and we take pride in keeping disruption to a minimum throughout.
We approach every renovation with the same care, whatever the size of the room. The site is kept clean and tidy at every stage, and we communicate clearly about what's happening and when, so you always know where the project stands.
What Happens After the Work Is Done?
We don't hand over a kitchen and disappear. Every project finishes with a thorough check of all the work, and we make sure you're completely happy before we call it done. Any snagging is dealt with promptly and professionally.
Kitchen Renovation or Handmade Kitchen?
If you're not sure whether you need a full renovation or a handmade kitchen, the difference comes down to scope. A handmade kitchen covers the design, manufacture and installation of bespoke cabinetry built in our workshop. A kitchen renovation includes that plus everything else: strip-out, plastering, tiling, flooring, electrical, and plumbing work. If you need the complete project managed for you, from the building work through to the fitted kitchen, this is the page you need.
Frequently Asked Questions
What is included in a kitchen renovation?
A full kitchen renovation can include stripping out and disposing of the old kitchen, replastering walls, electrical work (lighting, sockets, extraction), plumbing (repositioning sink, connecting appliances), flooring, wall and floor tiling, fitting all new units and worktops, installing appliances, and finishing joinery, architraves, skirting, boxing-in, and bespoke carpentry. Not every project needs all of these; we assess what's required and quote accordingly.
Do you manage the whole kitchen renovation?
Yes. Danny manages the entire renovation from start to finish. You have one point of contact and one timeline. You don't need to find separate plasterers, tilers, and floor fitters. Danny coordinates everything and makes sure each stage is completed to a high standard before the next begins.
Can you help with flooring, tiling and plastering?
Yes. Flooring installation (tile, LVT, laminate), wall and floor tiling, and plastering are all part of our full renovation service. These are coordinated alongside the kitchen fitting so everything aligns properly and the finished result is consistent throughout.
Do I need to arrange separate trades?
No. One of the main reasons Sheffield homeowners choose Hudson Joinery is that Danny handles the coordination of all trades involved in a kitchen renovation. You have a single point of contact throughout, and Danny manages the sequencing so each trade's work is done at the right time.
How disruptive is a kitchen renovation?
A kitchen renovation is unavoidably disruptive: you'll be without a working kitchen for the duration. However, we minimise the impact by keeping the site clean and tidy at the end of each working day, using dust sheets and protection, and communicating clearly about what's happening and when. We recommend planning alternative cooking arrangements for the duration of the project.
How long does a kitchen renovation usually take?
A complete kitchen renovation (involving strip-out, plastering, tiling, flooring, electrical, plumbing, fitting, and finishing) typically takes between one and three weeks depending on the scope. A straightforward replacement without major additional trades may be quicker. We give you a clear, specific timeline before work starts and keep you updated throughout.